Continuous Improvement · SME Strategy

Starting CI Late: A Practical Guide for SMEs

You didn't build CI into the foundations. Here's how to catch up — and make it stick.

6 min read  ·  Lean Management  ·  SME Growth
Lean habits cartoon — Years of practice vs handing someone a Lean Package

Origin unknown but widely shared — and it says everything about the challenge facing SMEs.

Step 01
Recognise the Need
Step 02
Get the Language Right
Step 03
Build Champions & Sponsors
Step 04
Formalise Training

The cartoon above illustrates the challenge perfectly. Toyota's success with Lean wasn't built on a training package — it was built on years of practice, coaching, and repetition, embedded from day one into how they run the business. For most SMEs, that ship has sailed. The business was up and running long before CI was ever considered. So the question becomes: …Now what?

01

Recognise That You Need CI in Your Business

The first and most important step is simply to acknowledge it. Most SMEs — typically 30 to 100 people — reach a point where they can no longer operate in start-up mode. The informal systems that got them here won't get them where they need to go.

You can buy CI knowledge by hiring experienced personnel or engaging consultants, and both can achieve short-term goals. But the risk is significant: those initiatives become their initiatives. When they leave, so does the CI. The ethos never embeds into the organisation.

The goal is not to import CI. It is to grow it from within — so it outlasts any individual, consultant, or programme.
02

Get the Vocabulary in Place — Starting at the Top

In every instance where I have been asked to revitalise a CI programme, the major failing of the previous initiative has been lack of — or only passive — support from the senior team. Passive support sounds like: "I'm all for CI, but it doesn't apply to me."

If the senior team does not understand the concepts or the language, CI will never embed. Before anything else, train the senior managers in the basics. Emphasise that they must be active supporters, not passive bystanders, and make clear what the role of a sponsor looks like in practice.

"I'm all for CI — but it doesn't apply to me." That one sentence has killed more programmes than any lack of training ever has.

Finally, make CI part of the senior team's weekly and monthly metrics. What gets measured gets managed — and what gets managed stays current.

▶ Train senior managers first. Make CI visible in their metrics from day one.
03

Identify Champions and Align Sponsors

Once the senior team is onboard, identify local CI champions — people on the ground with the credibility and enthusiasm to lead initiatives. Train them to a level where they can drive change, not just participate in it.

For every initiative, align a senior team member as its sponsor. Make sure initiatives involve the right mix of levels and departments, and train all participants in the specific concepts associated with that initiative. Over time, as initiatives multiply, broader and broader groups receive the foundational training — organically, through doing.

▶ Every initiative needs a champion who leads it and a sponsor who backs it.
04

Formalise Training — With Consistent Themes and Language

Training is where most organisations get lost. What kind? Who gets trained and to what level? Formal belt certification or initiative-focused learning? In-house or external? Online or in-room? And critically — how do you know if it's working when many Lean initiatives don't show up directly in the financial results?

The answer is not to avoid formalisation — it is to do it right. Whether introductory (Yellow Belt equivalent), intermediate (Green), or advanced (Black), training must use consistent themes, language, and formats across the board. Use interaction, assignments, and assessments to test competency as you go. And with all formal programmes, insist on a real project being completed as part of the curriculum.

With thousands of trainees at all levels, every programme I have been involved with has delivered more than 200% ROI on training costs.

Danaher built an entire library of tools and methods around their Danaher Business System. Most SMEs don't have the time, money, or expertise to replicate that — but they don't need to. Start with what is pressing. Build the library as you go.

▶ Insist on a completed project as part of every formal training programme. That's where the ROI lives.